2006 - Project Prometheus Final Report

The Prometheus Project Reactor Module Final Report KAPL letter SPP-67110-0008 / Bettis letter B-SE-0155 dated April 24, 2006 (4/24/2006) provides a integrated project summary of efforts on the project. The report was requested following a NASA decision in Sept 2005 to terminate NR Program participation in the project.


Volume 1 Provides a Program Summary

Volume 2 Provides a Technical Summary

Volume 3 Provides a Bibliography (documents that are not flagged as controlled are available from OSTI.GOV)


Keywords: JIMO, Jupiter Icy Moons Orbiter, NASA


Table of Contents of Report:

Volume 1 : Program Summary

EXECUTIVE SUMMARY .............................................................................................. 1-3

INTRODUCTION AND BACKGROUND ...................................................................... 1-5

PROJECT SCOPE ..................................................................................................... 1-8

3.1 Prometheus Project Goals ....................................................................................... 1-8

3.2 Comparison to Past Space Reactor Projects .............................................................1 -8

3.3 Project Challenges ....................................................................................................1 -9

PROJECT MANAGEMENT APPROACH ..................................................................1 -11

4.1 Planning Documents ............................................................................................1..-.1 1

4.1 . 1 Responsibility Assignment Matrix (RAM) ....................................................1. -11

4.1.2 SNPP Work Breakdown Structure .............................................................1..- 12

4.1.3 Space Reactor Planning Estimate (SRPE) ...............................................1..- 13

4.2 Acquisition Strategy .............................................................................................1..-.1. 6

4.3 Assembly, Test, and Launch Operations (ATLO) Strategy ...................................... 1-17

4.4 Program Management Perspectives. .....................................................................1..- 20

ASSET TRANSFER ................................................................................................... 1-21

5.1 NRPCT Documentation .........................................................................................1..- 21

5.1 . 1 NRPCT Technical and Programmatic Documents ....................................... 1-21

5.1.2 Accessibility of NRPCT Prometheus Information ......................................... 1-21

5.2 Equipment and Materials ......................................................................................1..-.2 2

PROJECT COST ....................................................................................................1 - 2 3

6.1 Total Project Cost (Inception-to-Date): ..................................................................1..- 23

6.2 Residual Project Closeout Costs (Through FY06): .................................................1 -24

Volume 2: Technical Summary

1 INTRODUCTION AND SUMMARY .............................................................................. 2-3

1. 1 Background ............................................................................................................2..-.3

1.2 Summary of Feasibility Studies and Concept Selection .............................................2 -3

1.3 Project Prometheus Requirements ...........................................................................2. -5

1.4 Technical Challenges .............................................................................................2..-.8

1.5 Gas-cooled Reactor Brayton Concept Description. ................................................2..- 10

2 REACTORSUMMARY ........................................................................................... 2 1 9

2.1 Issues and Challenges ...........................................................................................2. -19

2.2 Summary of Work .................................................................................................2..-.2 0

2.3 Key Findings and Perspectives ............................................................................2.-..2 4

3 MATERIALS SUMMARY ........................................................................................... 2-28

3.1 Fuel Materials. ......................................................................................................2..-.2 8

3.1 . 1 Issues and Challenges ..............................................................................2..- 29

3.1.2 Summary of Work .....................................................................................2..-.3 0

3.1.3 Key Findings and Perspectives ..................................................................2..- 34

3.2 Core and Plant Structural Materials .......................................................................2.-. 35

3.2.1 Issues and Challenges ...............................................................................2. -35

3.2.2 Summary of Work ......................................................................................2.-. 37

3.2.3 Key Findings and Perspectives ..................................................................2..- 39

Prometheus Project Reactor Module Final Repott SPP-67110-0008

Page vi

3.3 Shield Materials ...................................................................................................2..-.3. 9

3.3.1 Issues and Challenges .............................................................................2.-..3 9

3.3.2 Summary of Work .....................................................................................2..-.3 9

3.3.3 Key Findings and Perspectives. .................................................................2..- 40

3.4 Reflector Materials ...............................................................................................2.-..4 1

3.4.1 Issues and Challenges .............................................................................2..-.4 1

3.4.2 Summary of Work ......................................................................................2.-. 42

3.4.3 Key Findings and Perspectives. .................................................................2..- 42

3.5 Irradiation Testing of Fuel, Fuel Elements, and Structural Materials ........................ 2-43

3.5.1 Issues and Challenges ...............................................................................2. -43

3.5.2 Summary of Work ......................................................................................2..- 43

3.5.3 Key Findings .............................................................................................2..-. 45

SHIELDING SUMMARY ............................................................................................ 2-46

4.1 Issues and Challenges ..........................................................................................2..- 48

4.2 Summary of Work ...................................................................................................2. -49

4.3 Key Findings and Perspectives ..............................................................................2. -49

PLANT SUMMARY .................................................................................................... 2-51

5.1 Issues and Challenges ...........................................................................................2. -51

5.2 Summary of Work ..................................................................................................2..- 51

5.3 Key Findings and Perspectives ............................................................................... 2-54

INSTRUMENTATION AND CONTROL SUMMARY .................................................. 2-59

6.1 Issues and Challenges ..........................................................................................2..- 59

6.2 Summary of Work ...................................................................................................2.- 62

6.3 Key Findings and Perspectives ..............................................................................2. -69

INTEGRATED SYSTEM TESTING SUMMARY ......................................................... 2-71

7.1 Issues and Challenges ........................................................................................2.-..7.1

7.2 Summary of Work ................................................................................................2..-.7. 1

7.3 Key Findings and Perspectives ............................................................................2..-.7 2

MISSION EXTENSIBILITY ......................................................................................... 2-74

8.1 Issues and Challenges .........................................................................................2..-.7 4

8.2 Summary of Work ................................................................................................2..-.7. 5

8.3 Key Findings and Perspectives .............................................................................2..- 75

8.3.1 Extensibility to Other Deep Space Missions ................................................2. -75

8.3.2 Extensibility to Moon and Mars Surface Missions ........................................ 2-76

KEY FINDINGS AND A PERSPECTIVE ON NEAR-TERM DEVELOPMENT ........... 2-78

Volume 3: Bibliography

1 INTRODUCTION .......................................................................................................... 3-3

2 NRPCT Documents ..................................................................................................... 3-3

NRPCT Subcontracted Reports ................................................................................. 3-6

3.1 Program Management and Support .........................................................................3..- 6

3.2 Reactor Module Reactor Segment ...........................................................................3.-. 6

3.3 Reactor Module Primary Plant Segment ..................................................................3..- 8

3.4 Reactor Module Shield Segment .............................................................................3..- 9

3.5 Reactor Module Instrumentation and Control Segment ............................................3. -9

3.6 Reactor Module Integrated Testing ........................................................................3..- 10

3.7 Reactor Module Safety and Mission Assurance ......................................................3. -11

3.8 Reactor Module Materials Test and Evaluation ......................................................3. -12

Prometheus Project Reactor Module Final Report SPP-67110-0008

Page vii

Reactor Module Reactor Segment ....................................................................... 315

4.1 Heat Transfer ....................................................................................................3..-.1..5.

4.2 Silicon Carbide ......................................................................................................3..- 16

4.3 Other Reactor Design .........................................................................................3..-.1..7

4.4 Manufacturing ....................................................................................................3..-.2..1

Reactor Module Primary Plant Segment ................................................................ 3-21

5.1 Prometheus Requirements ..................................................................................3..-.2. 1

5.2 Historical Space Reactors ...................................................................................3..-.2. 1

5.3 Brayton Component Development. ........................................................................3..- 22

5.4 Alternator Development. ......................................................................................3..-.2. 4

5.5 Gas Foil Bearing Development ..............................................................................3..- 24

5.6 Recuperator Development. ....................................................................................3..- 24

5.7 Plant Systems .......................................................................................................3..- 25

5.8 Alternative Energy Conversion Systems - Stirling ....................................................3 -26

5.9 Alternative Energy Conversion Systems - Liquid Metal ............................................3 -27

5.10 Alternative Energy Conversion Systems - Thermoelectric ....................................... 3-28

5.1 1 China HTR I Japan HTTRJHTGR Development Efforts ............................................ 3-28

5.12 Sublimation ...........................................................................................................3..- 30

5.13 Space Structural Design Basis (SSDB) ..............................................................3 -30

Reactor Module Shield Segment ............................................................................. 3-34

Reactor Module Instrumentation and Control ........................................................ 3-34

Reactor Module Integrated Testing ......................................................................... 3-35

Reactor Module Safety and Mission Assurance .................................................... 3-35

Reactor Module Ground Test Reactor .................................................................... 3-36

Reactor Module Materials Test and Evaluation ..................................................... 3-37

CHECKING ACCESS CREDENTIALS

Subscribe to NR-HA  Newsletter

Thanks for submitting!

Send an email to support@nr-ha.org to unsubscribe.

The Naval Reactors Historical Association (NR-HA) is a private, self-supporting, IRC 501(c)(3) non-profit, non-federal entity.  NR-HA supports the U.S. military, its veterans, as well as past and present federal employees that worked at Naval Reactors; however, it is not officially connected to or endorsed by the U.S. Department of Energy, U.S. Department of Defense, or any of their branches or departments including Naval Reactors.

This site is not considered subject to DOD prepublication review.  See https://www.nr-ha.org/about for additional information in this regard.

  • Linkedin
Version 5.05
bottom of page